Datang Linqing Thermal Power Company's Peak Regulation Heating Flexibility Transformation EPC General Contracting Project |
EPC General Contracting Project Design Labor Service for Peak Regulation Heating Flexibility Transformation |
2023 |
|
|
Yongxing Fine Chemical Park Undertaking Industrial Transformation Demonstration Zone and Supporting Infrastructure Construction Project (Steam Station Project) |
2 units of 75t/h boilers, building area approximately 13,000 square meters |
2023 |
|
|
Xinhang Industrial Development Zone Central Heating Project |
Central Heating Station (2 units of 20t/h gas boilers) |
2022 |
|
|
Wannan Tongling Power Co., Ltd. Ammonia Co-firing Carbon Reduction Project Large Flow Ammonia Combustion Design |
One large-capacity water bath liquid ammonia evaporator, with the heat source mainly from unit circulating water return and supplemented by steam heating; large flow ammonia combustion inlet ammonia gas pipeline design |
2022 |
|
|
Jiu Gui Jiu Co., Ltd. New Production Area 3 Project Gas Boiler Project |
Steam supply 125t/h, 5 units of 25t/h gas steam boilers |
2021 |
|
|
Hunan Bangpu Recycling Technology Co., Ltd. Waste Power Battery Recycling Industrialization Expansion Project 2×20t/h Boiler Room Equipment |
2×20t/h gas steam boilers |
2021 |
|
|
Anhua County Gaoming Industrial Park Central Heating Station and Pipeline Project |
2x20t/h biomass gas boilers, including a steam external pipe supplying 1 kilometer to the park, steam pressure 1.25MPa |
2021 |
|
|
Hunan Ranyan Energy Co., Ltd. Pingjiang High-tech Zone Wushi Industrial Park Central Heating Station and Park Heating Pipeline Project |
1x30t/h biomass gas boiler + 1x25t/h biomass gas boiler, simultaneously equipped with 2 biomass gasifiers, considering 1x25t/h natural gas steam boiler as a backup boiler, including approximately five kilometers of steam external pipe from the boiler room to the park and ten units. Steam pressure 2.5MPa, 300℃ |
2020 |
|
|
Hunan Heng'an Household Paper 70 Ton Boiler Renovation Project |
1 unit of 70t/h sub-high pressure circulating fluidized bed boiler |
2019 |
|
|
Yiyang Changchun Economic Development Zone New Material Industrial Park 1x8t/h Boiler Room Project |
1x8t/h biomass pellet steam boiler |
2019 |
|
|
China Nuclear 272 Uranium Industry Co., Ltd. Boiler Technology Renovation Project |
|
2018 |
|
|
Hunan Changde Dexin Paper Co., Ltd. 1×20t/h New Boiler Room Project 1×20t/h Coal-fired Steam Chain Boiler |
|
2017 |
|
|
Xinyangfeng Zhongphosphorus 600,000 tons/year Nitrogen Compound Fertilizer Thermal Power Project |
1×50t/h circulating fluidized bed boiler and supporting 1×3000KW back pressure generator set |
2015 |
|
|
National Level Suqian Economic and Technological Development Zone Solar Thermal Photovoltaic Demonstration Power Station and Combined Heat and Power Project |
200KW solar thermal power generation 200KW photovoltaic power generation |
2013 |
|
|
Jiu Gui Jiu Co., Ltd. Boiler Room Renovation and Expansion Project |
4x20t/h steam boilers |
2012 |
|
|
Hunan Jindadi Materials Co., Ltd. Vanadium Ore Decarbonization Waste Heat Comprehensive Utilization Project |
1x35t/h + 1x6MW medium temperature and pressure extraction condensing steam turbine generator set |
2009 |
|
|
Inner Mongolia Shuangxin Environmental Protection Materials Co., Ltd. 110,000 tons/year biodegradable polymer polyvinyl alcohol project |
4 units of 130-ton boilers, supporting 4 sets of 12000KW steam turbine generator sets |
2009 |
|
|
Yichang Xinyangfeng Fertilizer Co., Ltd. 400,000 tons/year Sulfuric Acid Waste Heat Power Generation Project |
2 sets of steam turbines and 3000KW generator sets |
2009 |
|
|
Sichuan An County Galaxy Construction Chemical Group 150kt/a Chrome Slag Resource Treatment Supporting 120,000 tons Sulfuric Acid Project |
Waste Heat Power Generation |
2008 |
|
|
China Salt Haolong Salt Chemical Co., Ltd. Self-supplied Thermal Power Station Energy-saving Optimization Comprehensive Renovation Project |
|
2008 |
|
|
Chongqing Wuling Xingwang Chemical Co., Ltd. Sulfuric Acid Supporting 3000KW Waste Heat Power Generation Project |
Steam turbine and 3000KW generator set |
2008 |
|
|
Jingmen Yangfeng Zhongphosphorus Mining Co., Ltd. Yangfeng 200,000 tons/year Sulfuric Acid Waste Heat Power Generation Project |
Steam turbine and 1500KW generator set |
2007 |
|
|
Guizhou Xiyang Fertilizer Co., Ltd. 35 tons/hour Boiler Project |
35 tons/hour boiler |
2002 |
|
|
Hunan Yahua Seed Industry Co., Ltd. Hunan Biological Pharmaceutical Factory Relocation Project Boiler Room |
1x10t/h, 2x20t/h chain boilers |
2001 |
|
|
Zhuzhou Chemical Plant Sulfuric Acid Waste Heat Power Generation Project |
Steam turbine and 3000KW generator set |
2001 |
|
|
Liuyang Phosphate Mine Sulfuric Acid Waste Heat Power Generation Project |
Steam turbine and 3000KW generator set |
2000 |
|
|
Hunan Taolin Lead-Zinc Mine Sulfuric Acid Waste Heat Power Generation Project |
Steam turbine and 1500KW generator set |
2000 |
|
|
Lengshuijiang City Fertilizer Plant Sulfuric Acid Waste Heat Power Generation Project |
Steam turbine and 1500KW generator set |
2000 |
|
|
Pingjiang Nitrogen Fertilizer Plant Differential Pressure Power Generation Project |
Steam turbine and 1500KW generator set |
1999 |
|